0.5 ha
Total project area
Available for sale
Wastewater treatment
- Capacity: 21,200 cubic meters per day
1/6
Wastewater treatment
- Capacity: 21,200 cubic meters per day
Electrical transmission system
- 22 kV transmission line
Wide road network
- Main road: 14 meters wide (4 traffic lanes)
- Secondary road: 7 meters wide (2 traffic lanes)
Flood prevention system with pipes and drainage channels
- Water pipes and drainage channels: V-ditch
Street lighting
- Street lighting within the project: Compliant with the Department of Highways' road lighting standards
24-hour Security system
- Surveillance and monitoring team
- Over 20 CCTV cameras
- 24-hour incident reporting